A man has pleaded guilty to killing toddler Louisa (Lulu) Palmisano by dangerous driving, following a horror crash between a tram and a van in February.
The court heard that Rawal Rehman, 36, had taken ‘at least 20 lines of cocaine’ in a seven-hour window leading up to the crash.
On 22 February 2025, shortly before 10am, Rehman’s Mercedes sprinter van failed to stop at a Stop sign and collided with a tram.
His vehicle then mounted the pavement, striking three-year-old Lulu and both her parents who were walking hand-in-hand down Booth Street.
Tragically, Lulu – who her family described as the ‘sweetest, kindest, and most generous little girl’ – suffered fatal injuries.
ADVERTISEMENT
Several passersby rushed to assist the family, including a junior doctor.
She was taken to hospital but died soon after of her injuries, which included a major head trauma.
ADVERTISEMENT
Rehman, meanwhile, abandoned his van and left the scene in a taxi, later identified by documents in his vehicle and arrested two days later. He claimed to have panicked when questioned as to why he fled the scene.
He pleaded guilty at Manchester crown court on Tuesday 22 April to causing the death of Lulu by dangerous driving.
The scene of the tram-van crash that killed Lulu. Credit: The Manc Group
Prosecutor Rachel Shenton told Manchester Crown Court that he had visited two massage parlours in the city hours before and that he had taken ‘at least 20 lines of cocaine’ in seven hours.
ADVERTISEMENT
Abbie Clarke, Senior Crown Prosecutor for CPS North West, said: “This was a devastating incident which shocked our community, and our thoughts go out to Lulu’s family who must bear this unimaginable loss.
“Rawal Rehman ignored the stop signs and tram warning signs when he drove straight into the path of an oncoming tram, and it is clear his driving fell far short of what is expected of a competent and careful driver.
“Rehman failed to take responsibility for his actions. He fled the scene in a taxi and denied that he drove dangerously in interview, only accepting responsibility on his third hearing before the court.
“He must now face the consequences for his role in this wholly avoidable tragedy.”
Exciting new CGIs released of £500m Therme Manchester wellness resort as construction continues
Emily Sergeant
As construction continues on Manchester’s massive wellness resort, some new CGIs have now been released.
In case you need bringing up to speed, construction of the £500 million Therme Manchester wellness resort officially began last September after several years of planning, and now developers have released some exciting new CGIs – with an update on how construction is going, as a new milestone has been reached this week.
Set to open to the public in 2029, Therme Manchester will become one of the largest urban wellbeing resorts in the world.
Visitors can expect to make the most of a 10 pools – both lagoon and wave pools included – thermal bathing, multi-sensory sauna rituals, steam rooms, 18 water slides, affordably-priced luxury spa therapies, and health and fitness experiences.
Exciting new CGIs released of Therme Manchester have been released / Credit: Supplied
At the heart of Therme Manchester will be three distinct zones, each offering a different way to spend time at the resort.
Play will bring together water-based fun and attractions for families and visitors of all ages, and Restore will focus on thermal bathing and restorative experiences designed to help visitors unwind, while Relax will offer spaces for relaxation and wellbeing.
The latest CGIs showcase the design as it develops – including the resort’s extensive indoor and outdoor spaces, and its 53,000sq ft wellbeing garden.
Construction is still underway on the £500m wellness resort / Credit: Supplied
The plans also feature a new public plaza designed to strengthen connections between the resort and the Bridgewater Canal.
Professor David Russell, CEO of Therme UK, said: “We have taken the opportunity to refine the design, improve how traffic and parking are managed and create a more welcoming environment for everyone arriving at the resort.
“We are creating an even better experience for visitors while supporting more efficient and sustainable operations.”
Therme Manchester was initially touted as a £250m project that would complete in 2025, but it’s now up to £500m and is scheduled to complete it 2029.
It marks one of the most significant building developments to ever take place in the North.
Featured Image – Supplied
News
All students in England to be offered the chance to do a new Ukrainian GCSE
Emily Sergeant
All students in England are soon to be offered the chance to do a new Ukrainian GCSE.
Said to be part of the UK’s ‘enduring support’ for the Ukrainian community and continued commitment to stand with Ukraine and its people, young people in England, Wales, and Northern Ireland will now have the opportunity to study for a new Ukrainian GCSE, the Government has announced.
While the qualification will be open to all students, it marks a ‘particularly significant’ milestone for Ukrainian children and young people living in the UK.
It’s hoped that the introduction of the new GCSE will help Ukrainians to preserve a vital connection to their language, culture, and identity.
It’s also hoped that it’ll open pathways to future education and employment for all pupils.
In line with the other modern foreign language GCSEs that are currently on offer, the qualification will assess listening, speaking, reading, and writing skills, while also recognising the cultural and historical contexts that shape the Ukrainian language.
Examination board AQA will now begin the next phase of development, bringing together language and subject experts to design what will be a ‘high-quality’ qualification reflecting the richness of Ukrainian language and culture.
Education Secretary, Lucy Powell, commented: “As they build their lives here in the UK, it is right that Ukrainians and their children should have every opportunity to maintain that connection to their heritage and to be proud of who they are.
“This new qualification is available to all pupils and will give them the chance to develop their language skills and celebrate Ukraine’s rich culture and history, while also opening pathways to future study and employment and strengthening our partnership with Ukraine.
“Through that enduring partnership, we are building the lasting ties between our countries that will see the young minds of the future move forward together, and foster connections that transcend borders.”
The Ukrainian GCSE is expected to be available for first teaching from September 2028 – with first assessments taking place in 2029.