There’s not long left until Santa and his reindeer crew fly over the skies of Manchester to drop off all those presents.
And it seems like Manchester must have been extra nice this year, as Santa is treating us to lots of chances to catch a glimpse of him on his mission to deliver millions of gifts in time for Christmas.
Just like every year, Santa is dusting off his sleigh and polishing his boots to prepare for his biggest night visiting lots of kids and families. The sleigh is being filled with lots of goodies and surprises as we speak… it’s almost like he can smell the milk and cookies from here.
NASA, one of the world’s leading space companies, has been working meticulously to find out Santa’s route for 2025.
The world-renowned space agency has given us an exact time to look up at the stars to spot the main man himself and catch the glimmer of lights from his sleigh.
ADVERTISEMENT
NASA has reveals the exact time you can see ‘Santa’s sleigh’ flying over Greater Manchester this Christmas / Credit: Tim Mossholder (via Unsplash)
As a man who has lots of experience globe trotting, it’s safe to say the big man knows how to efficiently cover as many houses as possible all in one night.
Santa’s sleigh will, coincidentally (*wink wink), be present at the same time as the International Space Station (ISS), however anyone looking to see this festive vehicle can notice the lights won’t change direction and will not flash.
ADVERTISEMENT
This time round, Santa is swooshing round Greater Manchester on Christmas Day a whole hour earlier than last year, meaning that nice list must be the longest it’s ever been.
___
Wednesday 24 December
5:21am
ADVERTISEMENT
Santa’s sleigh lights will be visible for two minutes travelling South East to East, as the man of Christmas weighs up his North West delivery route.
6:54am
There’s a six minute opportunity to catch those bright lights of Santa’s sleigh in the Manchester sky as he travels from West to South East, finalising his map before the big night ahead.
Thursday 25 December
4:35am
It will be visible for less than a minute, no movement, in a static position. Santa will be doing a headcount of all the houses to make sure he’s not missed a single chimney.
ADVERTISEMENT
6:08am
The sleigh will be seen for four minutes, moving from South West to South East, by now Santa will have finished his Manchester delivery drop and will be heading on over the hill to our friends in Leeds.
Exciting new CGIs released of £500m Therme Manchester wellness resort as construction continues
Emily Sergeant
As construction continues on Manchester’s massive wellness resort, some new CGIs have now been released.
In case you need bringing up to speed, construction of the £500 million Therme Manchester wellness resort officially began last September after several years of planning, and now developers have released some exciting new CGIs – with an update on how construction is going, as a new milestone has been reached this week.
Set to open to the public in 2029, Therme Manchester will become one of the largest urban wellbeing resorts in the world.
Visitors can expect to make the most of a 10 pools – both lagoon and wave pools included – thermal bathing, multi-sensory sauna rituals, steam rooms, 18 water slides, affordably-priced luxury spa therapies, and health and fitness experiences.
Exciting new CGIs released of Therme Manchester have been released / Credit: Supplied
At the heart of Therme Manchester will be three distinct zones, each offering a different way to spend time at the resort.
Play will bring together water-based fun and attractions for families and visitors of all ages, and Restore will focus on thermal bathing and restorative experiences designed to help visitors unwind, while Relax will offer spaces for relaxation and wellbeing.
The latest CGIs showcase the design as it develops – including the resort’s extensive indoor and outdoor spaces, and its 53,000sq ft wellbeing garden.
Construction is still underway on the £500m wellness resort / Credit: Supplied
The plans also feature a new public plaza designed to strengthen connections between the resort and the Bridgewater Canal.
Professor David Russell, CEO of Therme UK, said: “We have taken the opportunity to refine the design, improve how traffic and parking are managed and create a more welcoming environment for everyone arriving at the resort.
“We are creating an even better experience for visitors while supporting more efficient and sustainable operations.”
Therme Manchester was initially touted as a £250m project that would complete in 2025, but it’s now up to £500m and is scheduled to complete it 2029.
It marks one of the most significant building developments to ever take place in the North.
Featured Image – Supplied
News
All students in England to be offered the chance to do a new Ukrainian GCSE
Emily Sergeant
All students in England are soon to be offered the chance to do a new Ukrainian GCSE.
Said to be part of the UK’s ‘enduring support’ for the Ukrainian community and continued commitment to stand with Ukraine and its people, young people in England, Wales, and Northern Ireland will now have the opportunity to study for a new Ukrainian GCSE, the Government has announced.
While the qualification will be open to all students, it marks a ‘particularly significant’ milestone for Ukrainian children and young people living in the UK.
It’s hoped that the introduction of the new GCSE will help Ukrainians to preserve a vital connection to their language, culture, and identity.
It’s also hoped that it’ll open pathways to future education and employment for all pupils.
In line with the other modern foreign language GCSEs that are currently on offer, the qualification will assess listening, speaking, reading, and writing skills, while also recognising the cultural and historical contexts that shape the Ukrainian language.
Examination board AQA will now begin the next phase of development, bringing together language and subject experts to design what will be a ‘high-quality’ qualification reflecting the richness of Ukrainian language and culture.
Education Secretary, Lucy Powell, commented: “As they build their lives here in the UK, it is right that Ukrainians and their children should have every opportunity to maintain that connection to their heritage and to be proud of who they are.
“This new qualification is available to all pupils and will give them the chance to develop their language skills and celebrate Ukraine’s rich culture and history, while also opening pathways to future study and employment and strengthening our partnership with Ukraine.
“Through that enduring partnership, we are building the lasting ties between our countries that will see the young minds of the future move forward together, and foster connections that transcend borders.”
The Ukrainian GCSE is expected to be available for first teaching from September 2028 – with first assessments taking place in 2029.