Mayor Andy Burnham and fellow local leaders have unveiled the latest plans behind the vision to bring the Greater Manchester and nearby train links under the Bee Network.
For starters, the plan is to add a total of eight rail lines to the ever-growing public transport system.
Posting the latest schematic on social media this Friday, the Greater Manchester Mayor celebrated the unified tap-and-go service for buses and trams at the start of the week and has now ended it by sharing the next steps with the 10 boroughs.
We started the week by integrating buses and trams into a single tap-and-go system.
The update is in response to the UK government’s ‘A Railway Fit for Britain’s Future‘ reform bill, the national consultation of which is well underway and closes to local authorities and the public at large on Tuesday, 15 April.
ADVERTISEMENT
The overall aim is for Greater Manchester to reach an agreement with the government in devolving power to Mayoral Combined Authorities when it comes to the planning and developing of local infrastructure and train services.
Put simply, the goal is to achieve local responsibility and accountability for rail travel as the city-region looks to continue establishing its own ‘London-style’ public transport framework (i.e. the Oyster card which is valid for buses tubes, local railway and so on).
ADVERTISEMENT
In addition to this, they are hoping to make new arrangements for funding, fares and services through the Railway Bill, which would hopefully see rail fares in and around Greater Manchester, as well as neighbouring areas like parts of Cheshire and Derbyshire, fall under the Bee Network cap.
Once again, this regional push is a reaction to the country’s various rail companies’ continuing struggle to provide both affordable and reliable train travel.
Sub-quality rail services in the North, especially, are a big driving force behind the plans to loop train travel into the Bee Network.
Detailing a three-phase plan to carry out these city-region specific changes as the Labour Party looks to establish Great British Railways – a new body bringing track and train together – local authorities are already working closely with the Great British Railways Transition Team (GBRTT).
ADVERTISEMENT
Speaking on the masterplan, which culminates in a full ‘Bee Network Rail by 2030, Burnham has dubbed it “a once-in-a-generation opportunity to rewire how the railways are run”, and one that can set a standard for other areas up and down the country.
The Mayor went on to add: “We’re already delivering change in Greater Manchester and have seen the positive benefit that greater local control and accountability for our tram, bus and active travel has had, with increasing numbers of people getting on board – but rail is the missing piece of the jigsaw…
“A Bee Network fare cap – including rail – would mean that people commuting into the city at peak times from Glossop could pay a cap of around £14 including return train travel as well as trips on buses and trams.
“Devolution is working for people in Greater Manchester, but we know that many other areas are at different stages of their journey […] We know the government share our ambition to restore confidence and get more people choosing the train, and we’ve been really encouraged by our conversations so far on how things can be done differently.”
Featured Images — daniel0685 (via Flickr)/The Manc Group
Travel & Tourism
Greater Manchester officially launches five-year climate change action plan
Danny Jones
Greater Manchester has officially begun its five-year climate change action plan, with the overarching goal of becoming a net-zero city region by 2038.
The comprehensive pledge put together over a number of years itself will see Manchester City Council and the nearby local authorities put into action a number of key measures that will help to reduce not only central carbon figures but, eventually, across the 10 boroughs in turn.
Over the last 15 years, emissions have been reduced by approximately 64%, saving an estimated 44,344 tonnes of carbon through cleaner building energy, street lighting and other electronics, as well as the increasingly green and over-growing Bee Network.
They have also insisted that it isn’t just about cutting down on greenhouse gases; the aim is to make the city region and the surrounding areas more sustainable, affordable and create a better standard of life.
Our five-year plan to tackle climate change launches today. 🌏
It details how we’ll continue to deliver dramatic reductions in the amount of carbon we emit (the biggest contributor to climate change). 🏙️
As per the summary on the Council website, in addition to creating more efficient homes, they’re hoping to provide more access to nature and good-quality green space, “public transport you can rely on”, and “better health and wellbeing for those who live, work, study and visit here.”
With a steadily recovering local and national economy (touch wood), they’re also hoping for an influx of new jobs, too.
Summarising the key bullet points leading up to the end of the decade, these are the next steps currently outlined by the Council:
Lower carbon emissions
Grow the use of renewable energy
Improve low-carbon travel in the city
Improve air quality
Grow the city’s natural environment and boost biodiversity
Improve resilience to flooding and extreme heat
Engage and involve our workforce and our city’s communities
Reduce waste and grow reuse, repair, sharing and recycling
Support a move to a more circular economy
Minimise the negative impact of events held in the city
Develop our knowledge of our indirect emissions and lower them
Create a green financing strategy and explore new funding models for the city
Influence the environmental practices of other organisations
As for emissions, the target is now to drop the present output by another 34%, which will prevent almost 43,000 tonnes of carbon dioxide (CO₂) from being pumped into the atmosphere.
Having touched upon the continued expansion of the Bee Network infrastructure, Transport for Greater Manchester (TfGM) is also set to install multiple new travel links over the coming years, including both new tram stops and train stations – further
You can read the climate action plan in full HERE.
Exciting new CGIs released of Greater Manchester town’s first train station in 60 years
Emily Sergeant
Some new CGIs of a train station set to be built in a Greater Manchester town that’s been without one for 60 years have been released.
It’s been a whopping six decades, but the residents of Golborne will soon be able to hop on a train out of there, because a planning application to connect the Greater Manchester town, in the Wigan borough, was approved by Wigan Council back in May after it was submitted back in November of last year.
This means connectivity is finally one step closer to becoming reality.
Alongside the CGIs, a flythrough video of the new £32m rail station set to be built next year has also been revealed.
Following strong public support in a 2024 consultation, Transport for Greater Manchester (TfGM) will be working in partnership with Wigan Council and Greater Manchester Combined Authority (GMCA) to deliver the major project.
A new flythrough video reveals plans for a £32m rail station in Golborne – reconnecting the town to the network for the first time in 60+ years.
Construction starts next year, first trains by 2027.
Golborne-based engineering firm Murphy has been appointed to develop the station designs, taking into account the feedback from the local community.
A full business case is set to be submitted to the Department for Transport (DfT) in early 2026, and then, subject to approval, construction work is expected to start in the summer.
In case you didn’t know, Golborne currently has no direct bus, train, or tram services to Manchester, while the wider area is the largest and most-populous area in Greater Manchester not connected to the rail network.
According to approved plans, the new accessible two-platform station will feature improved car parking and better walking and cycling links to the town centre, as well as also enable ‘seamless connections’ and support Greater Manchester’s vision for a fully integrated Bee Network by 2030.
Exciting new CGIs of a Greater Manchester town’s first train station in 60 years have been released / Credit: TfGM
Mayor Andy Burnham says this is ‘the next major milestone’ for Golborne train station.
“The latest designs showcasing the transformation that’s on the way, with a station right at the heart of this community,” he commented.
“Golborne will play a vital role in our ambitious plans to make travel across Greater Manchester easier, greener, simpler, and more connected. This forms part of our plans to expand the Bee Network, with 64 stations joining by 2028 and a further 32 by 2030.