Patients dying in corridors, a lack of equipment, and generally unsafe practices are the findings of a harrowing new report into nursing.
Towards the end of last month, the Royal College of Nursing (RCN) – which is biggest nursing union and professional body in the world, with more than 500,000 members – asked its members to answer a short survey into the state of nursing throughout 2024, and thousands of nurses across the UK responded.
The report documents the experiences of more than 5,000 NHS nursing staff, with several raw, unedited, and often heartbreaking responses included, all of which confirm that ‘corridor care’, as it’s known, is “widespread” nationwide.
Almost seven in 10 (66.8%) respondents said they’re delivering care in “over-crowded or unsuitable places”, such as corridors, converted cupboards, and even car parks, on a daily basis.
More than nine in 10 (90.8%) said patient safety is being “compromised”.
According to the findings from the survey, demoralised nursing staff reported caring for as many as 40 patients in a single corridor, and find they are unable to access oxygen, cardiac monitors, suction, and other lifesaving equipment during this time.
Some of the more shocking accounts including in the report are of female patients miscarrying in corridors, and nurses being unable to provide adequate or timely CPR to patients having heart attacks.
Nursing staff also report cancer patients being put in corridors and other “inappropriate” spaces.
Nurses are calling for Government support as 90% say patient safety is being ‘compromised’ / Credit: Stephen Andrews (via Unsplash)
More than a quarter of nursing staff surveyed said they weren’t told the corridor they were providing care in was classed as a “temporary escalation space”, which is what the report says NHS England referred to it as, and this means that certain risk protocols and measures may not be in place to ease pressures and protect patients.
This is why the RCN is calling on officials to publish how many patients are being cared for in corridors and other inappropriate places.
The union is urging the Government and NHS England from an RCN-led coalition.
RCN General Secretary and Chief Executive, Professor Nicola Ranger, said this devastating testimony from frontline nursing staff shows patients are coming to harm “every day”, and are “forced” to endure unsafe treatment.
“The revelations from our wards must now become a moment in time,” Professor Ranger said.
“A moment for bold Government action on an NHS which has been neglected for so long. Ministers cannot shirk responsibility and need to recognise that recovering patient care will take new investment, including building a strong nursing workforce.”
Featured Image – Pxhere
News
More than 100 ‘unsafe’ counterfeit Labubus seized in Oldham
Daisy Jackson
More than 100 counterfeit Labubus and accessories have been seized in Oldham, the council has announced.
The Labubu dolls – a plush collectible with giant smiles and bunny ears – have been seized because they are fake, and unsafe.
The haul of 104 Labubus has been given a street value of between £800 and £1000 – but if they were the real deal, they’d be worth more than three times as much.
The poorly-made figures were being sold for a fraction of the price of a real Labubu, which are manufactured by Chinese company Pop Mart (it’s set to open its second Manchester store in the Trafford Centre next week).
Oldham Council’s Trading Standards team said it seized the counterfeit Labubus from local businesses and found that they were unsafe and poorly made.
Officers raised concerns about the safety of the dolls, which had small parts such as eyes, hands and feet broke off easily, creating a choking hazard.
What a genuine Labubu should look like. Credit: The Hoot Leeds
They were also missing legally required safety marks such as the CE or UKCA labels, and lacked the name and address of a UK supplier, which is another legal requirement.
Councillor Elaine Taylor, Oldham Council’s Cabinet Member for Housing and Licensing, said: “Oldham Trading Standards carries out regular checks to help keep unsafe products off the shelves. In this case, these counterfeit toys failed safety standards and have now been removed from sale.
“We know it can be tempting to buy toys that look like a bargain, but parents need to be extra careful. Fake toys like these may be cheaper, but they can put children in real danger if they’re not made to strict safety standards.
“If anyone has concerns about toys they’ve purchased, or if they see unsafe products on sale locally, we’d encourage them to get in touch with Trading Standards through the Consumer Helpline on 0808 223 1133.”
Council publishes list of central Manchester roads set to be resurfaced this summer
Emily Sergeant
A list of roads in Manchester that are set to be resurfaced before the summer is out has been published.
Manchester City Council recently asked residents in the region what their priorities were for their community and what issues they wanted to see tackled – and for many, the answer was the quality of the road surfaces.
Since then, the Council says it has been ‘engaged’ in a long-running programme of improvement works throughout the borough.
Now, with just over a month of the summer season left, it has been confirmed that some vital resurfacing works are due to start over the coming weeks in north and central Manchester, bringing a range of improvements to key district roads along with it.
First up, from Saturday 9 August, Hollinwood Avenue is to be resurfaced.
The Council has published a list of Manchester roads that are set to be resurfaced this summer / Credit: MJ Richardson (via Geograph)
Anticipated to take six weeks to complete, this work will be carried out during weekend closures from 8am-5pm, with the road remaining open during the working week.
The closure area will be between Greengates Roundabout and the Oldham boundary at Owler Lane, and a signed diversion route will be in place while work is carried out, and access for residents will be maintained at all times.
Then, starting from Saturday 16 August, resurfacing works will begin on Moss Lane East, between Alexandra Road and Princess Road.
Work will take place between 7am and 5pm on weekdays, and 8am and 5pm on weekends, and during the works, the road will be completely closed – with a signed diversion route in place and access for residents maintained.
As always, disruption is expected and the public is encouraged to plan ahead / Credit: Mylo Kaye (via Unsplash)
These works are expected to take six weeks to complete, and as with all resurfacing projects, residents should expect some disruption and may need to plan ahead.
The Council is aiming to keep disruption to the public at a minimum, where possible.
“We know how important it is to our residents that key roads are well maintained, which is why were glad to be able to deliver this latest round of improvement works,” commented Councillor Tracey Rawlins, who is the Executive Member for Clean Air, Environment, and Transport at Manchester City Council.
“I’d like to thank people ahead of time for their patience during the course of these works and would advise them to check when closures will be in place and where the diversions are.”
You can find more information on the resurfacing works on the Council website here.